Stockpile volume¶
Measure the volume of a stockpile of gravel, sand, ore or other bulk material directly from a drone point cloud.
Who can do this: Everyone with access to the channel, including public links
Beta feature
The stockpile volume tool is in beta. Results are suitable for operational estimates. Do not use them as certified survey measurements without independent checking. See Known limitations and the Disclaimer.
Video tutorial (planned): Measuring a stockpile
YouTube ID: TBD · ~4 min Covers: getting close, drawing the base polygon on the ground, reading cut/fill, recalculating, and drawing consistently between surveys.
What it measures¶
You draw a shape around the foot of the stockpile, clicking on the ground. DATACT uses those clicks to estimate where the ground was before the stockpile was placed (the base). It then calculates how much material sits above the base, and how much space below it is empty.
| Result | What it means |
|---|---|
| Cut volume (above base) | Material above the base. For a normal stockpile, this is the stockpile volume. |
| Fill volume (below base) | Hollows or pits below the base inside the shape |
| Net volume (cut − fill) | Cut minus fill |
| 2D polygon area | The footprint of your shape, seen from above |
| Max cut height | The highest point above the base |
| Max fill depth | The deepest point below the base |
| Points used, Grid cell size, Grid cells (occupied), Avg pts / cell | How much data the calculation was based on |
For a stockpile on flat ground with no pits, Cut volume is the number you want. Fill volume will be close to zero.
Measuring a stockpile¶
1. Open the 3D viewer and get close¶
Open the 3D viewer. Move in until the stockpile fills most of the screen. More detail loads close up, and more detail gives a more accurate volume.
2. Start the tool¶
Click Stockpile volume (BETA) in the toolbar. A bar at the bottom of the screen shows how many corners you have placed.
3. Draw around the base¶
Click on the ground at the foot of the stockpile, all the way around it. Do not click on the slope of the pile itself. This is the most important step for an accurate result.
- Use as many corners as you need to follow the edge.
- Add more corners where the edge curves or where the ground slopes.
4. Calculate¶
Click Calculate Volume (or double-click). The results appear in the Measurements section of the sidebar.
Drawing the base and calculating
File: assets/media/guides/3d/stockpile-volume-draw.gif · 10 s
Show: corners placed on the ground around a stockpile, Calculate Volume clicked, the coloured overlay and results appearing.
The 3D view shows the result in colour:
- Red = cut: the stockpile surface above the base
- Blue = fill: hollows below the base
- Orange = the estimated base
Stockpile results
File: assets/media/guides/3d/stockpile-volume-results.png
Show: the results table in the sidebar and the red/blue/orange overlay on the stockpile.
5. Copy, recalculate or remove¶
- Copy copies the results to the clipboard.
- Recalculate runs the calculation again, for example after you have moved closer to load more detail.
- Remove clears the result so you can draw again.
If fewer than 50 points were found, a warning asks you to move closer and click Recalculate.
How the calculation works¶
The base¶
The base is built only from the corners you click. Each corner sits on the point cloud, so it has a height. DATACT connects the corners with triangles to form a surface under the stockpile. No older survey or terrain model is used.
This means the base is only as good as your clicks. A corner on the slope of the pile, or a corner on a bump, moves the base and changes the volume.
The volume¶
The area inside the shape is divided into a grid. The cell size is chosen from the point density, aiming for about five points per cell. For each cell, DATACT compares the highest point to the base below it (for cut) and the lowest point to the base (for fill), and multiplies the difference by the cell area. All cells are added together.
Getting consistent results¶
When the same stockpile is measured several times, redrawing the shape each time, results typically differ by 0–3 %. The difference comes from small changes in where the foot of the pile is clicked, not from the calculation.
Consistency beats a single number
If you track a stockpile over several surveys, draw the shape the same way each time: same view angle, same distance, same visual edge. The change between surveys is then meaningful, even though each single figure has some uncertainty.
- Move close to the foot of the pile before placing corners. Do not draw from a distant overview.
- Rotate the view until the edge between ground and pile is clear.
- Take a screenshot of each finished shape so you can repeat it next time.
- On sloping ground, add more corners on the sloped side.
Known limitations¶
- Small stockpiles have lower relative accuracy, because each grid cell is a larger share of the total.
- Sparse data. Cells without points do not count towards the volume. Low drone overlap or measuring from far away gives fewer points. Check Points used and Grid cells (occupied).
- Hidden material. Only the visible surface is measured. Material under overhangs, under roofs or behind walls is not captured.
- Uneven ground under the pile. The base is a straight-line estimate between your corners. If the ground under the pile is very uneven, the estimate will not follow it exactly.
- Volume, not weight. Results are in cubic metres. To get tonnes, multiply by the bulk density of the material. Swell and compaction are not taken into account.
Disclaimer¶
Volumes in DATACT are geometric estimates from drone data and a shape drawn by the user. The accuracy depends on the quality of the point cloud, the survey flight, surface conditions, how close you were when calculating, and how precisely the shape was drawn. Small changes in the shape can change the volume by several percent.
Svarmi does not guarantee the accuracy of individual measurements and accepts no liability for decisions made on the basis of volumes calculated in DATACT. Do not use results for contractual, legal or compliance purposes without independent verification by a licensed surveyor.